| Channel Enlargement (50 year) - Summary Annual Average Damage | |||||||||||
| Client/Authority | |||||||||||
| Environment Agency | |||||||||||
| Project name | Option: | ||||||||||
| Bin Brook Pre-feasibility Study | Channel Enlargement | ||||||||||
| Project reference | WNCBIN | ||||||||||
| Base date for estimates (year 0) | Oct-2002 | First mid-year of damage: | 0 | Prepared (date) | 10/28/02 | ||||||
| Scaling factor (e.g. £m, £k, £) | £ | Last mid-year of period: | 49 | Printed | 11/07/02 | ||||||
| Discount rate | 3.5% | PV factor for mid-year 0: | 24.091 | Prepared by | MDG | ||||||
| Checked by | |||||||||||
| Applicable year (if time varying) | Checked date | ||||||||||
| Average waiting time (yrs) between events/frequency per year | Total PV | ||||||||||
| 1 | 2 | 5 | 10 | 20 | 50 | 100 | 200 | Infinity | £ | ||
| 1.000 | 0.500 | 0.200 | 0.100 | 0.050 | 0.020 | 0.010 | 0.005 | 0 | |||
| Damage category | Damage £ | ||||||||||
| Residential property | 0 | 0 | 0 | 0 | 0 | 51510.24 | 80675.76 | 235984.74 | 391293.72 | 91388 | |
| Ind/commercial (direct) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Ind/comm (indirect) | 0 | 0 | |||||||||
| Traffic related | 0 | 0 | |||||||||
| Emergency services | 0 | 0 | |||||||||
| Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | ||||||||||
| 0 | 0 | ||||||||||
| Total damage | £ | 0 | 0 | 0 | 0 | 0 | 51510.24 | 80675.76 | 235984.74 | 391293.72 | |
| Area (damagexfrequency) | 0.00 | 0.00 | 0.00 | 0.00 | 772.65 | 660.93 | 791.65 | 1568.20 | |||
| Total area, as above | 3793.43 | ||||||||||
| PV Factor, as above | 24.091 | ||||||||||
| Present value (assuming no change in damage or event frequency) | 91388 | 91,388 | |||||||||
| Notes | |||||||||||
| Area calculations assume drop to zero at maximum frequency. | |||||||||||
| Default value for the highest possible damage assumes continuation of gradient for last two points, an alternative value can | |||||||||||
| be entered, if appropriate. | |||||||||||
| One form should be completed for each option, including 'without project', and for each representative year if profile changes | |||||||||||
| during scheme life (e.g. sea-level rise) | |||||||||||
| Residential property, Industrial / commercial (direct), and Other damages are itemised in Asset AAD sheet and automatically linked | |||||||||||
| to this sheet | |||||||||||