| Maintain - Summary Annual Average Damage | |||||||||||
| Client/Authority | |||||||||||
| Environment Agency | |||||||||||
| Project name | Option: | ||||||||||
| Bin Brook Pre-feasibility Study | Maintain | ||||||||||
| Project reference | WNCBIN | ||||||||||
| Base date for estimates (year 0) | Oct-2002 | First mid-year of damage: | 0 | Prepared (date) | 10/28/02 | ||||||
| Scaling factor (e.g. £m, £k, £) | £ | Last mid-year of period: | 49 | Printed | 11/07/02 | ||||||
| Discount rate | 6% | PV factor for mid-year 0: | 16.650 | Prepared by | MDG | ||||||
| Checked by | |||||||||||
| Applicable year (if time varying) | Checked date | ||||||||||
| Average waiting time (yrs) between events/frequency per year | Total PV | ||||||||||
| 1 | 2 | 5 | 10 | 20 | 50 | 100 | 200 | Infinity | £ | ||
| 1.000 | 0.500 | 0.200 | 0.100 | 0.050 | 0.020 | 0.010 | 0.005 | 0 | |||
| Damage category | Damage £ | ||||||||||
| Residential property | 0 | 0 | 1284.52 | 4471.79 | 22783.24 | 128063.52 | 214633.74 | 316116.73 | 417599.72 | 138182 | |
| Ind/commercial (direct) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Ind/comm (indirect) | 0 | 0 | |||||||||
| Traffic related | 0 | 0 | |||||||||
| Emergency services | 0 | 0 | |||||||||
| Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | ||||||||||
| 0 | 0 | ||||||||||
| Total damage | £ | 0 | 0 | 1284.52 | 4471.79 | 22783.24 | 128063.52 | 214633.74 | 316116.73 | 417599.72 | |
| Area (damagexfrequency) | 0.00 | 192.68 | 287.82 | 681.38 | 2262.70 | 1713.49 | 1326.88 | 1834.29 | |||
| Total area, as above | 8299.22 | ||||||||||
| PV Factor, as above | 16.650 | ||||||||||
| Present value (assuming no change in damage or event frequency) | 138182 | 138,182 | |||||||||
| Notes | |||||||||||
| Area calculations assume drop to zero at maximum frequency. | |||||||||||
| Default value for the highest possible damage assumes continuation of gradient for last two points, an alternative value can | |||||||||||
| be entered, if appropriate. | |||||||||||
| One form should be completed for each option, including 'without project', and for each representative year if profile changes | |||||||||||
| during scheme life (e.g. sea-level rise) | |||||||||||
| Residential property, Industrial / commercial (direct), and Other damages are itemised in Asset AAD sheet and automatically linked | |||||||||||
| to this sheet | |||||||||||